Timetable Extras

Increasing Timetable Flexibility/Troubleshooting

How to increase flexibility of a timetable. This article is intended for Admin. (Read Time: 5 minutes)

Last updated: 29/06/2022

By editing and reviewing teacher sets, teacher allocation, rooming, restrictions, block vs core, feasibility issues and room allocations, you can help get your timetable file to 100%. These troubleshooting steps can be carried out when the file seems to be 'stuck' on the last few percent (a very common query for support), however it is good to keep these points in mind from the start. The key to removing a blockage and getting to 100% is providing the solver with as much flexibility as you possibly can.


 

1 - Clone your file

It is highly recommended that you first clone your timetable. This is best practice so that you don't loose any data on your original file.

2 - Clear the lessons

Clear the lessons from the grid. (Do this in Screen 7 Construction, we are not referring to the grid in screen 2 Grid here).

3 - Assign teachers in Screen 4 - Teacher Sets 

Manually assign teachers (and rooms) only when absolutely necessary. If you assign lots of teachers or rooms in advance, they are almost certain to cause a blockage. 

First, to give the solver a bigger pool of teachers to choose from, go to screen 4. Teacher Sets and fill in every subject that each teacher is capable of taking in a given year/cycle.

The more comprehensive the data in this screen is, the better it will be in the long term so it is worth investing time in this initially as it will still apply for as long as those teachers are in the school.

 

4- Only assign specialist rooms to classes that absolutely need it in (Screen 5, Class Data).

We recommend that you only assign specialist rooms to classes that absolutely need it (e.g Woodwork, Home Ec etc) and in the case of Science subjects that you only assign labs to doubles or individual lessons that actually need a lab, not for all lessons of the teaching group.

 

5 - Use preferred rooms sparingly in Screen 3, Teacher Data

Use screen 3, Teacher Data if a teacher prefers a certain room and then select a room under the Pref. room column, but avoid this where possible. Once set, the solver will do its best to give the teacher this room where feasible but note that rooms specified in room pools will not be auto assigned using the auto assign function.

 

 

6 - Make use of room pools

Click here for a guide to set up room pools.


On Screen 5 Class Data you can click the Edit Individual Room and Teacher Assignments (highlighted above) to edit individual lessons within a teaching group.

As we can see below we have our spread of 2,1,1,1 for 2Sci-B and for the double we have assigned the Science Room Pool while the rest of the lessons are blank.

 

 

7 - Loosen teacher time restrictions in Screen 3, Teacher data

Restrictions can massively hinder a timetable and should only be put in place when absolutely necessary. 

They can be particularly damaging if the teacher(s) involved take classes in a block. This limits the amount of times available for a wider number of teachers and lessons than those you have restrictions in place for. 

Click on the time slot to change the colour.

Orange means the solver will try not to schedule the teacher at that time, but it is not guaranteed.

Red means the solver will definitely not schedule the teacher in that time slot.  

 

8 - Block vs Core

Where possible, keep as many classes in core as you can, because blocked classes are much more difficult to timetable. The more in core, the more likely you are to get to 100%.

9 - Room demand and exclude rooms features in Screen 7, Construction and Screen 5, Class Data

Another handy diagnostic tool is the Exclude Rooms/Teachers function.

Exclude Rooms/Teacher will ask the solver to disregard room or teacher clashes for the specified year groups and generate the timetable regardless. This enables you to see what errors occur and get an idea where the issues are.

You can do this on screen 7, Construction > Actions > Exclude Room/Exclude Teachers. You are then asked to apply a filter, this works in the same way as restrictions. I.e., if you want to target all 5th year classes you type 5*. If you want to target all years simply type * before clicking Apply. More info on restrictions can be found here

You can also check the demands on each room in Screen 5, Class Data by clicking Actions > Room Demands. If there are number of rooms almost at full usage even before you click generate, it is unlikely that you will get very far.

10 - Feasibility Issues in Screen 7, Construction.

When the ‘Generate’ Button is pressed in Screen 7, Construction, our software will automatically test for ‘infeasibility’. This feasibility checker informs you of issues in your timetable file that will prevent it reaching 100%. 

Note: having no feasibility issues does not necessarily mean that the file will be viable.

Restriction

Below are examples of feasibility issues you may encounter. Regardless of the message, it is important not to get too bogged down in the specific classes listed and try to first take an holistic approach by going through the steps to increase flexibility in your file.

 

 

Multiple feasibility issues can be difficult to diagnose but often, fixing one or two of the problems fixes the rest.

  • Careful use of room pools (see above) is one possible way to alleviate errors.
  • If multiple blocks are showing as an issue, try to isolate the teacher who may be causing the problem and remove them from the block. If this doesn't work, add them back in and try another teacher. Repeat the process to see if you can pinpoint the possible source. (Even if the error says it relates to a room, it can often still be a problem with a teacher).
  • Often (but not exclusively) many problems stem from blocks in 1st and 5th year as these are brand new. 

    More info on the feasibility checker can be found here.

If all else fails:

If you've tried all of the above order to give the timetable more flexibility and you are still encountering issues, it is simply a case of going through them again to try and isolate where the  blockage is coming from.

 

Summary of checklist:

  1. Clone your timetable. This is best practice so that you don't lose any data on your original file.
  2. Clear the lessons from the grid. (Do this in Screen 7 Construction). (We are not referring to the grid in screen 2 Grid here). 
  3. Fill in teacher sets as extensively as you can. (Screen 4, Teacher Sets).
  4. Only assign specialist rooms to classes that absolutely need it (e.g Woodwork, Home Ec etc) and in the case of Science subjects, only assign labs to doubles or individual lessons that actually need a lab, not for all lessons of the teaching group (Screen 5, Class Data).
  5. Avoid giving teachers preferred rooms if it isn’t necessary (Screen 3, Teacher Data).
  6. Make use of room pools.
  7. Do not put individual teacher time restrictions in place unless absolutely necessary. Restrictions can severely hinder a timetable, particularly if a teacher with restrictions teaches lessons in blocks as this has the knock-on effect of tying up every other teacher involved with the same restriction (Screen 3, Teacher data).
  8. Where possible, keep as many classes in core as you can, because blocked classes are much more difficult to timetable. The more in core, the more likely you are to get to 100%.
  9. Check the demand on each room (Screen 5, Class Data) and Use the Exclude Rooms feature as a diagnostic tool. (Screen 7, Construction).
  10. Use the The feasibility checker as a diagnostic tool, (Screen 7, Construction).

Click here for an article on checking your timetable feasibility

 

 


If you still have questions, please visit our knowledge base at support.vsware.ie. You can contact our support team via email at support@vsware.ie, via the chat bubble when you are logged into your VSware account or via phone on 01-5549628. Support hours are Mon - Fri, 08:30 - 18:00.